Portion Of White Rock Visitor Center Parking Lot Closed July 25-29 To Prepare For County’s First Level 3 DC Fast Charging Station For Electric Vehicles

COUNTY News:

Los Alamos County has announced that a portion of the White Rock Visitor Center parking lot will be closed Monday through Friday, July 25-29, to prepare the area for the installation of the County’s first Level 3 DC fast charger for electric vehicles.

While the 65-kW charger has not yet been delivered and will be installed at a later date, a Department of Public Utilities (DPU) contractor will be trenching in the parking lot to install electrical conduits and placing a concrete pad in preparation for the charger installation.

This is the first Level 3 charger in Los Alamos County. There are two Level 2 charge ports at the White Rock Town Hall and six at the Los Alamos County Municipal Building. A second Level 3 charger will be installed at the municipal building.

DPU received grant funding to procure and install the Level 3 chargers.

Search
LOS ALAMOS

ladailypost.com website support locally by OviNuppi Systems