Review, 2023 Annual Periodic Monitoring Report For Base-Flow Sampling Added To LANL Electronic Reading Room

LANL News:

Per regulatory requirements, Los Alamos National Laboratory (LANL) announces new documents have been added to the Los Alamos Legacy Cleanup Contract Electronic Public Reading Room.

All legacy cleanup documents required to be posted after April 30, 2018, are available on the site linked above.

For legacy cleanup documents that were posted prior to April 30, 2018, please visit the LANL electronic public reading room:

  • Review, 2023 Annual Periodic Monitoring Report for The General Surveillance Monitoring Group: Los Alamos and Pueblo Canyon, Mortandad and Sandia Canyon, Water Canyon/Canon de Valle, Ancho Canyon, White Rock Canyon, and Pajarito Canyon Watersheds (Link)
  • Review, 2023 Annual Periodic Monitoring Report for Base-Flow Sampling: Los Alamos Canyon, Water Canyon, White Rock Canyon, and Pajarito Canyon Watersheds (Link)

Members of the public with any questions, please contact N3B Los Alamos.

Produced by the Los Alamos Legacy Cleanup Contractor, N3B Los Alamos, on behalf of DOE’s Environmental Management Los Alamos Field Office.

Search
LOS ALAMOS

ladailypost.com website support locally by OviNuppi Systems