Cone Zone: Week Of July 30, 2024

Public Works Projects:

Los Alamos County Public Works’ staff manages the projects listed in this section through contractors.

For more information, email lacpw@lacnm.us, call 505.662.8150, or visit the “County Projects” link and select “Public Works” at https://lacnm.com/pw-projects.

Please slow down and use caution within the construction work zones.

Please note the information below is based on a schedule provided by the contractors and may change due to weather or other delays. 

DP Road Phase II Reconstruction Project Update

TLC Plumbing & Utility work Monday through Friday, 7 a.m. to 5 p.m.

Parking:

            • Parking will not be allowed south of DP Road outside designated areas south of Ace Hardware and south of the Los Alamos Fire Training Academy.

Traffic Control:

            • Crews will continue excavating the joint communication electrical trench between 264 DP Road and 278 DP Road and the joint gas and water trench on DP Road east of businesses on DP Road towards the LANL TA-21 gate;
  • New survey marks and staking have been added to the work zone within the business area. To avoid disturbing markers, caution should be used when crossing the work zone;
  • Follow all work zone signs and exercise caution; flaggers may direct traffic during certain construction events; and
  • Access to businesses will be maintained; westbound traffic direction remains unchanged. 

All questions and concerns should be sent to the Public Works Department at lacpw@lacnm.us or call 505.662.8150. For additional project details, visit the Public Works Department DP Road Reconstruction Project.

Urban Trail Phase I and II Project

Crews will work 6 a.m. to 6 p.m., Monday to Friday, with possible weekend work if needed.

            • Construction of the Trail continues along the north side of Canyon Road between the Tennis Courts and Los Alamos Nature Center driveway;
            • The north shoulder on Canyon remains closed, with two lanes of traffic generally maintained;
  • The sidewalk section on the northwest corner of Trinity Drive/20th Street will be closed for repair work. Pedestrian detours will be in place;
  • Flaggers will be used when lane closures are needed for construction vehicle access to the work areas; and
  • Work to construct the boardwalk section of the trail will also continue in the wooded area by the Tennis Courts.

All questions, concerns, or special access needs should be sent to the Public Works Department at lacpw@lacnm.us call 505.662.8150. Thank you for your cooperation and patience. For additional project details, visit the Public Works Department Urban Trail Project webpage.

Utilities Projects:  

Los Alamos County Dept. of Public Utilities (DPU) staff manages the projects listed in this section. Please slow down and use caution within the construction work zones. Contact the Customer Care Center 505.662.8333, CustomerCare@lacnm.us, or visit ladpu.com/Projects

Overlook Park Irrigation Work Continues

The trail section at Overlook Park between Spirio Soccer Field and Softball Field 3 is closed to all traffic, including pedestrians. This closure is necessary for work on interconnecting the irrigation system with the potable water system as a backup to the reclaimed water that is typically used to water the fields. This work is expected to last into October. 

Traffic & Streets Projects:  

Los Alamos County Traffic & Streets Division staff manages the projects listed in this section. Please slow down and use caution within the construction work zones. Call Daniel Blea, Traffic and Streets Manager, for concerns 505.663.8112.  

Road closure on the east end of Loma del Escolar at Barranca Road Continues

Crews have closed the east end of Loma de Escolar at Barranca Road to make safety improvements to existing ADA ramps before school starts. The west end of Loma de Escolar will be open to local traffic. Sidewalks along the north side of Barranca Road and within the construction zone of Loma del Escolar will be closed to pedestrians. Access to residential properties will be maintained. This project will continue through Aug. 1. Work will end at 5 p.m. daily.

Contact Streets Superintendent Daniel Campos at 505.500.7321 or daniel.campos@lacnm.us with questions or concerns.

Crack Sealing Began Monday, July 29, in the North Community

Under contract with Los Alamos County, Dismuke Construction will begin crack sealing in the following North Community areas: Woodland Road, 35th Street, 36th Street, Alabama Avenue, Yucca Street, 48th Street, 47th St., 45th Street, and Club Road. Moving flagging operations may exist.

This project started in early June but was halted due to rain. Weather permitting, work will continue through Aug. 16. Work hours are 8 a.m. to 5 p.m. daily.

ADVANCE NOTICE: County Festival, Fair & Rodeo NEXT WEEKEND

Los Alamos County Festival, Fair & Rodeo will be held in downtown Los Alamos and on North Mesa at Brewer Area and the stables the weekend of Aug. 3-4.

A road closure on Central Avenue will be in place Saturday, Aug. 3, for the Fair Parade and for the Festival and Fair downtown. The closure will be in place from early morning until the event concludes. Additional details will be provided in next week’s Cone Zone.

In addition to the closure, motorists are asked to be cautious and slow down in the downtown and stable areas due to the significant increase in pedestrian and vehicle traffic for the event.

Non-County Projects: 

The following construction projects are not funded by Los Alamos County. Updates are included to keep residents informed of potential traffic impacts. Questions should be directed to the parties identified within each description. Please obey all traffic devices and slowdown in work zones.  

Concrete Work on 35th Street off Trinity Drive Continues 

In association with Pavilion Construction, as part of the scope of work for the Hills Apartment Complex and the realignment of 35th Street at Trinity Drive (N.M. 502), work continues to install sidewalks, curb and gutter, and other concrete work along 35th Street off Trinity Drive. A lane shift will remain in place until the work is completed.

Work will continue through August, beginning at 7 a.m. and finishing by 5 p.m. daily, Monday through Friday, and weekends as needed.

All questions, concerns, or special access needs should be sent to Pavilion Construction at 469.907.6045, or contact Joseph Nevarez at 505.385.7746.

Search
LOS ALAMOS

ladailypost.com website support locally by OviNuppi Systems