Grand Canyon Road Construction Friday Through March 26

COUNTY News:

Beginning Friday through March 26, Kelly Cable in association with GM Emulsion, will cut into the asphalt and curb at 160 Grand Canyon as long weather permits.

The work will take place 8 a.m. to 5 p.m. daily and there will be a flagging operation in place on the south side of Grand Canyon.

The sidewalk on the south side of Grand Canyon will be closed, foot traffic will be detoured to the north side of Grand Canyon.

Motorists should slowdown in the work zone and follow all temporary construction signage.

For concerns or issues related to this project, contact Kelly Cable at 505.690.9742 or 505.350.9295 or email Charlie Lovato at clovato@kellycorpnm.com.

Search
LOS ALAMOS

ladailypost.com website support locally by OviNuppi Systems