By JOHN BUCHSER
Chair
Northern Group of Sierra Club
Rio Grande Chapter
Over the last 10 years, new designs of wire for high voltage power lines have resulted in an over 85% capacity increase as compared to older wire design. This wire can be used to replace older wire at a cost 50% less than building new power lines.
If both power lines feeding LANL that cross the Rio Grande are reconductored, the total power capacity available to LANL will nearly double, without the disruption of a new power line that adds to the visual clutter across the canyon and traverses across a presently undisturbed section Read More









